Maximum rated output or gross output of a generator. For Solar, the total rated output of all panels measured in DC
Net of any station service
Maximum amount of energy produced in an hour measured in AC for all technologies
Expected annual energy output net of any station service. 1 MWh = 1,000 kWh
$15.00 per REC (measured in MWh) estimated to be generated per year by a Small Distributed Generation project and $25.00 per REC estimated to be generated per year by a Large Distributed Generation project. A performance guarantee deposit is at least $500 and not more than $75,000.

Your Account

Rhode Island Renewable Energy Growth Program

Note: For the best experience, we recommend completing this application using Google Chrome.
** Prior to utilizing the web application to submit your bid, please ensure that you have the following completed items below (in PDF format) that will be needed in order to fill out and submit the web application:
  • Valid (signed by applicant and Rhode Island Energy) Impact Study for Renewable DG (ISRDG) and/or Interconnection Service Agreement. This document should be stored in SalesForce, Form(Impact Study or Interconnection Service Agreement).
  • Existing hydro generation project material financial investment documentation, if applicable. This document should be stored in SalesForce, Form(REGrowth Existing Hydro or Other).
  • Project Segmentation and Tax Credit Eligibility Affidavit. This document should be stored in SalesForce, Form(REGrowth Affidavit or Other).
  • Assessor's maps. This document should be stored in SalesForce, Form(REGrowth Assessor Maps or Other).
  • For Shared Solar Medium­-Scale Solar Projects, a completed Customer Payment/Credit  Transfer Form. This document should be stored in SalesForce, Form(Payment Credit Transfer).
The application below was designed to require applicants to input information in all required fields, upload requested documents, and submit the application during a given session. This web application does not allow applicants to save information and return at a later time; all inputs will be lost if the application is not submitted prior to exiting. After submitting an online application, you will receive an email confirmation statement highlighting all inputs that were submitted in your enrollment application.

Applicant / Authorized Representative's Signature Certification Form

I, the undersigned, affirm that I am duly authorized to file this Application for the Rhode Island Renewable Energy Growth Program on behalf of the Project listed below. I hereby certify that all statements and representations made in this Application are true and accurate to the best of my knowledge, and I affirm that I have a positive duty to ascertain and maintain the accuracy of the statements made in this Application. I personally reviewed the statements set forth below and affirm that they are true and correct. I understand the requirements, terms and conditions of the Rhode Island Renewable Energy Growth Program, and I certify that the project submitted meets both the eligibility and threshold requirements of the program, as referenced in Solicitation and Enrollment Process Rules: (Check all that apply. All items below must remain "true" for the duration of the term, or the project is not eligible to participate in the program)
(* Indicates mandatory field).

Check each of the following boxes as confirmation regarding the Project:

* Is an Eligible Renewable Energy Resource;
* Has a nameplate capacity equal to or less than 5 MW;
* Will interconnect with the distribution system of The Narragansett Electric Company and will be located in The Narragansett Electric Company ISO-NE load zone;
* The Applicant owns or leases (or has an executed, exclusive, unconditional option to own or lease) the site (or residence in the case of Residential Small-Scale Solar Project) on which the project will be located, and that it has any additional rights required to develop and operate the Project at the site;
Is not already operating (possible exception for pre-existing hydro generation);
* Is not under construction, except for preparatory site work that is less than 25% of the estimated total project cost;
* Is not fully financed for construction;
* Is not a segment of a distributed generation project on the same parcel or contiguous parcels that would create multiple projects in order to qualify under smaller size project classifications;
* An Interconnection Application for the Project has been submitted and a completed Impact Study for Renewable Distributed Generation ("ISRDG") has been received, if needed, or a valid Interconnection Service Agreement has been signed by applicant and Rhode Island Energy;
*
*
*
*
*